Sun City Holiday Village - Apartments
Price: starts from 20 246 GBP

Location: Sunny Beach Completion date: April 2007 Catalogue No: SNB-1769
It is expected the Sun City Holiday Village to be situated on a vacant terrain located in the western part of the Sunny Beach Resort. This provides a possibility for an interesting town-planning solution. The availability of main roads ensures easy servicing of the complex, and the proximity to the beach will allow it to become inseparable part of the Slanchev Briag Resort and use all the facilities the resort possesses. The density of 30% and 1.0 intensity coefficient as per the building permit allow 3-4-storey construction so as to reach a spread-out built-up area of 6018 m2. The project offers distribution of the house groups along the periphery of the plot aiming at provision of quiet recreational area including a swimming pool, children's playgrounds, rest spots, which would enrich the resort in the field of social contacts. The situation solution involves free access of vehicles to any house group via ground garage . According to the geological report, the bases of the buildings should be about 1.7 m under the terrain level so that the semi-underground parking could utilize areas appearing under the first residential level. A 50-vehicle garage will make the area around the buildings free of cars.
The main access to the Sun City Holiday Village was searched from the local roadway developed by level elevations raising the level of the existing terrain. The town-plan solution allows, if wished, a fence to be placed around the complex so that entering of outside people and car access to be put under control, while the entering into and usage of the recreational area to be limited for resting people from the other residential areas.
The regulation distances to the side regulation lines as well as the distances between the buildings inside the plot have been observed. The elevations of all these are given in detail in the situational plan, and a layout drawing containing a coordinate list is enclosed in the geodetic section.
Maintenance
- Complete site management,
- Organization of the order within the territory of the Sun City II Holiday Village by local rules,
- Ensuring site security by the organization of the necessary security control,
- Maintenance of the yard (inner) communications (electric and water supply and sewerage) and repair of their possible damages,
- Maintenance of the outside water facilities (swimming pools, etc.),
- Keeping clean the territory of the holiday village: entrance staircases, swimming pools, grass areas, walks, recreational areas, children's playgrounds, as well as the car parking places,
- Maintenance of the village green areas and the trees,
- Elimination of emergencies having occurred in the apartments and immediate notification of the clients.
- Masonry: brick.
- Building insulation: thermal and hydro-insulation of the whole building by modern materials including such of the ceiling, facade, and basement premises.
- Facade covering: mineral plaster.
- For the basements: whitewashed walls and ceilings and metal dust-painted doors of the cellar premises.
- Water supply and sewerage system: by environmentally friendly PVC-piping and mounted water-meters.
- Built-up outside electric system and kiosk switchgear.
- Window-frames: environmentally friendly, nonflammable, noise-preventing, thermally insulating PVC material with double glazing.
- Staircase and under-window area: marble.
- Staircase handrails: luxury, metal.
- Balconies: luxury metal-and-glass handrails and granite-tiled floors.
- Inside electrical system with installed apartment board.
- Weak-current electrical system: TV, security, and telephone.
- Luxurious lift unit.
Floor Plans
Unit A: Ground Floor; 1 Floor; 2 Floor; 3 Floor; 4 Floor; 5 Floor;
Unit B: Ground and 1 Floor; 2 and 3 Floor; 3 and roof Floor;
Images
How to Reserve an Apartment?
You can reserve this property through us for two weeks by transferring a reservation fee. We will immediately pay the sum to the seller and he will take the property off the market. This amount will be deducted from the purchase price of the property when a Preliminary Purchase Agreement is signed with the seller.
Prices and Availabilities:
For current prices and availabilities, please Contact Us. Fill the form below.
Viewing Trip:
BGHouse organises viewing trip to all propertyes from our site. learn more
Contact FormDo You have interest about any property or have any question ? Do not hesitate. Contact Us. Feel the form below.
|